This was the question of our client. There was no design yet, and the first 500 products had to be available within 2,5 weeks. With some 'must-haves' taken into account the following steps were taken to ensure that our client received the expected products in time:
- Industrial Design;
- Product development incl. 3D CAD design, material selection, moldflow analysis, optimalisation;
- Rapid Tooling (mould design) incl. realisation of moulds and insert, first out – of - tool, trial serie, process optimization;
- Testing & Verification